Carbonated soft drinks

CSD Filling Production Line

Carbonation-aware filling where product temperature, pressure and closure quality are controlled together.

CSD Filling Production Line

Carbonated drinks add variables that still lines do not have: carbonation-related performance, product temperature and closure or seam quality all interact. The line is accepted against those measurements rather than against the speed printed on the machine.

Process flow

  1. 01

    Carbonation & mixing

    Carbonation set to specification with the process water treated beforehand.

  2. 02

    Counter-pressure filling

    Filling conditions held to prevent CO₂ loss and foaming.

  3. 03

    Crowning or capping

    Closure quality verified — torque and seal are part of the acceptance test.

  4. 04

    Inspection

    Fill quantity, carbonation performance and product temperature measured.

  5. 05

    Packing

    Labelling, coding, secondary packaging and palletising completed.

Equipment included

  • Water treatment and carbonation unit
  • Counter-pressure filler and capper
  • Inspection equipment
  • Labeling and coding
  • Packaging and palletising
  • Conveying and line control

Ready to begin?

Plan your beverage production line with Seven Zillions

Get pricing & solutions